Traffic Coatings
Parking Garages
Waterproofing and traffic coatings for parking decks, ramps and structures that carry vehicles while protecting the concrete below.
Concrete decks and ramps
Why this application fails
Where problems start
- Cracks and joints in the slab let water reach embedded steel
- Traffic wears through thin or unsuitable coatings
- Ramps and turning areas see concentrated stress
- Failed joints and drains channel water into the structure
Conditions to evaluate
- Concrete soundness, cracks, spalls and cover
- Existing coatings and their bond
- Slab moisture
- Traffic type and turning / ramp areas
- Joint locations and movement
Candidate system paths
Systems that commonly apply
Vehicular Traffic-Coating System
A layered concrete-deck assembly combining crack and joint treatment, waterproofing, aggregate and a wear-resistant traffic finish for parking structures and ramps.
View systemPedestrian Traffic-Coating System
A waterproofing and wear assembly for walkways, balconies and pedestrian decks that combines a membrane, slip-resistant surfacing and a decorative finish.
View systemCommon substrates
Concrete decks and ramps
Products used
Critical details
Where the work is won or lost
- Moving and construction joints
- Drains and low points
- Ramps, turns and speed bumps
- Columns, curbs and terminations
Specification checklist
What to confirm
- Concrete assessment and moisture testing
- Repair and joint-treatment scope
- Traffic zoning (drive lanes vs turns vs ramps)
- Slip-resistance and marking requirements
- Drainage review
Project example
Verified case study
A verified project example for this application will be published here once an authorized case study — with documented conditions, system and rights — is available. We do not publish unverified or illustrative projects.
FAQ
Parking Garages — common questions
Can the garage stay partly open during work?
Phasing is common on occupied structures and is planned around cure times and traffic. Scope and sequencing are confirmed during a project review.
Do cracks need to be repaired first?
Yes. Cracks and joints are assessed and treated before waterproofing so movement does not telegraph through the finished system.
Have a parking garages project?
Share the conditions and photos for a confirmed recommendation.
Fast Project ReviewQuick turnaround on every request.
Expert RecommendationsThe right system for your conditions.
Dedicated SupportFrom selection to installation.
